Well Record
Operator GREEN RESERVE ENERGY HOLDINGS LLC |
Well Number 17-SX-2 |
Location SW SW Sec 2 T 38 N R78 W |
|
Footage 984 FSL and 580 FWL |
Longitude 106.189443 |
|
Latitude 43.287656 |
Elevation Gr 5122 GR |
Elevation KB 0 |
TEAPOT NAVAL RESERVE |
Form 2 Status PR Date 01/2024 |
Total Depth 600 |
Plug Back 557 |
Bottom Formation SHANNON | | Formation SHANNON |
APD Record
--- |
Apd Approved 03/16/1977 |
Spud Date 03/16/1977 |
Completion Date 01/14/1978 |
Casing Record
Hole Size 7 7/8 |
| Casing Size 4 1/2 |
Casing Depth 596 |
Hole Size 16 |
| Casing Size 8 5/8 |
Casing Depth 40 |
Completion Record
Spud Date 03/16/1977 |
| Completion Date 02/18/2022 |
| Formation SHANNON |
Reservoir Class O |
|
Completion Record
Spud Date 03/16/1977 |
| Completion Date 03/18/1977 |
| Formation SHANNON |
Total Depth 600 |
| Date Td Reached 3/18/1977 |
| Plug Back 557 |
IP Oil Bbls 1 |
| IP Gas Mcf 0 |
| IP Water Bbls 0 |
Reservoir Class O |
| Date First Production 12/01/1977 |
| TD Formation SHANNON |
|
Perforation Record
Top Perfs |
Bottom Perfs |
Holes/Ft |
Size |
Type |
Purpose |
422 |
477 |
|
|
SHANNON |
OPEN 5-2-77 |
425 |
480 |
|
|
SHANNON |
OPEN 2-14-22 |
503 |
538 |
|
|
SHANNON |
OPEN 5-2-77 |
510 |
544 |
|
|
SHANNON |
OPEN 2-14-22 |
Producing Intervals
Top Interval |
Bottom Interval |
Measured |
Formation |
Treatments
Top Interval |
Bottom Interval |
Treatment |
Date |
Geological Tops
SHANNON,SS MBR (CODY SH)
| 421
|
Cumulative Production From Jan 1978 To Jan 2024
Oil 16,037 BBLS
Gas 2,897 MCF
Water 4,426 BBLS
Form 2's Filed
Production SHANNON
Logs Ran
DUAL INDUCTION - LATEROLOG |
GAMMA RAY |
DENSITY |
CEMENT BOND |
Sundry Record
Form Date |
Submission |
Action |
2022/05/19 |
NOTICE OF INTENT |
FRACTURE TREAT / ENHANCE |
2022/02/10 |
NOTICE OF INTENT |
CHANGE PLANS |
2022/02/06 |
NOTICE OF INTENT |
FRACTURE TREAT / ENHANCE |
2022/01/27 |
SUBSEQUENT REPORT |
FRACTURE TREAT / ENHANCE |
2021/06/22 |
NOTICE OF INTENT |
FRACTURE TREAT / ENHANCE |
2014/05/25 |
SUBSEQUENT REPORT |
RENAME |
2012/06/02 |
SUBSEQUENT REPORT |
PRODUCTION (START/RESUME) |
2012/04/23 |
SUBSEQUENT REPORT |
MIT |
2009/11/03 |
SUBSEQUENT REPORT |
SHUT-IN |