Well Record
API 025 - 10675
Operator GREEN RESERVE ENERGY HOLDINGS LLC Well Number 23-SX-3
Lease NPR #3 Lease No
Location SW NW Sec 3 T 38 N R78 W Footage 157 FNL and 862 FWL
Longitude 106.2087 Latitude 43.29481
Elevation Gr 5187 Elevation KB 5191 TEAPOT NAVAL RESERVE
Well ClassO Land Type 30
Form 2 Status PR Date 01/2024
Total Depth 540 Plug Back 515
Bottom Formation SHANNON Formation SHANNON

APD Record
--- Apd Approved 07/26/1978 Spud Date 07/26/1978 Completion Date 12/24/1978

Casing Record

Hole Size 7 7/8 Casing Size 4 1/2 Casing Depth 535
Hole Size 18 Casing Size 8 5/8 Casing Depth 33


Completion Record

Spud Date 07/26/1978 Completion Date 01/10/2022 Formation SHANNON
Total Depth 540 Date Td Reached 7/27/1978 Plug Back 515
Reservoir Class O Date First Production 1/12/2022 TD Formation SHANNON


Completion Record

Spud Date 07/26/1978 Completion Date 07/27/1978 Formation SHANNON
Total Depth 540 Date Td Reached 7/27/1978 Plug Back 515
IP Oil Bbls 1 IP Gas Mcf 0 IP Water Bbls 0
Reservoir Class O Date First Production 12/24/1978 TD Formation SHANNON


Perforation Record
Top Perfs Bottom Perfs Holes/Ft Size Type Purpose
333 442 SHANNON OPEN 8/16/78
350 450 SHANNON OPEN 12/29/21

Producing Intervals
Top Interval Bottom Interval Measured Formation
333 450 MD SHANNON

Treatments
Top Interval Bottom Interval Treatment Date
333 450 1/4/2022

Geological Tops

SHANNON,SS MBR (CODY SH) 333

Cumulative Production From Dec 1978 To Jan 2024
Oil   14,013 BBLS
Gas   729 MCF
Water 7,098 BBLS
Form 2's Filed

Production SHANNON


Logs Ran

DENSITY
INDUCTION ELECTRICAL
Sundry Record

Form Date Submission Action
2023/10/16 SUBSEQUENT REPORT FRACTURE TREAT / ENHANCE
2023/08/15 NOTICE OF INTENT FRACTURE TREAT / ENHANCE
2022/11/08 NOTICE OF INTENT FRACTURE TREAT / ENHANCE
2022/03/18 NOTICE OF INTENT FRACTURE TREAT / ENHANCE
2021/12/03 NOTICE OF INTENT FRACTURE TREAT / ENHANCE
2021/07/02 SUBSEQUENT REPORT FRACTURE TREAT / ENHANCE
2021/05/05 NOTICE OF INTENT HUFF N PUFF-AIR
2014/06/04 SUBSEQUENT REPORT START / RESUME PRODUCTION
2012/04/23 SUBSEQUENT REPORT MIT
2009/01/06 SUBSEQUENT REPORT SHUT-IN
2002/04/16 SUBSEQUENT REPORT PRODUCTION (START/RESUME)