Well Record
Operator GREEN RESERVE ENERGY HOLDINGS LLC |
Well Number 13-StX-23-H |
Location SW NW Sec 23 T 38 N R78 W |
|
Footage 1817 FNL and 248 FWL |
Longitude 106.19124 |
|
Latitude 43.25141 |
Footage 1133 FSL and 2549 FWL |
|
Location SE SW Sec 15 T 38 N R78 W |
BH Lat. 43.2595 |
|
BH Lon. -106.20202 |
Elevation Gr 5311 |
Elevation KB 0 |
TEAPOT NAVAL RESERVE |
Well ClassST |
| Land Type 30 |
Form 2 Status SI Date 01/2024 |
Bottom Formation STEELE | | Formation SHANNON |
APD Record
Apd Received 05/11/2015 |
Apd Approved 06/18/2015 |
Spud Date 07/20/2015 |
Completion Date 10/16/2015 |
Apd Received 05/01/2002 |
Apd Approved 05/06/2002 |
--- |
--- |
--- |
--- |
Spud Date 05/13/2002 |
Completion Date // |
Casing Record
Hole Size 6 1/8 |
| Casing Size 2 7/8 |
Casing Depth 5274 |
Hole Size 12 1/4 |
| Casing Size 9 5/8 |
Casing Depth 44 |
Hole Size 6 1/8 |
| Casing Size 4 1/2 |
Casing Depth 3591 |
Hole Size 8 3/4 |
| Casing Size 7 |
Casing Depth 1291 |
Completion Record
Spud Date 07/20/2015 |
| Completion Date 10/16/2015 |
| Formation STEELE |
Total Depth 1833 |
| Date Td Reached 09/13/2015 |
|
IP Oil Bbls 1 |
| IP Gas Mcf 0 |
| IP Water Bbls 23 |
Reservoir Class O |
| Date First Production 02/19/2019 |
| TD Formation STEELE |
|
Completion Record
Spud Date 05/13/2002 |
| Completion Date 05/15/2002 |
| Formation STEELE |
Total Depth 1296 |
| Date Td Reached 05/15/2002 |
|
Reservoir Class |
|
Producing Intervals
Top Interval |
Bottom Interval |
Measured |
Formation |
Geological Tops
SHANNON UPPER
| 1115
|
SHANNON LOWER
| 1219
|
STEELE BRITTLE
| 1672
|
STEELE FISHTOOTH
| 2479
|
Cumulative Production From Nov 2015 To ?
Oil 339 BBLS
Gas 0 MCF
Water 5,596 BBLS
Form 2's Filed
Production SHANNON
Production STEELE
Logs Ran
LITHOLOGY MUD 1:480 2.5"=100' MD (HORZ) 9-13-2015 |
RESISTIVITY GAMMA RAY CONDUCTIVITY 5"=100' MD 9-13-2015 |
Sundry Record
Form Date |
Submission |
Action |
2019/12/27 |
SUBSEQUENT REPORT |
RENAME |
2017/05/26 |
NOTICE OF INTENT |
OTHER |
2016/10/27 |
SUBSEQUENT REPORT |
SHUT-IN |
2016/07/14 |
NOTICE OF INTENT |
CHANGE PLANS |
2016/04/26 |
NOTICE OF INTENT |
OTHER |
2016/01/28 |
NOTICE OF INTENT |
OTHER |
2015/08/06 |
SUBSEQUENT REPORT |
LOCATION OR SITE CHANGE |
2015/06/24 |
NOTICE OF INTENT |
CHANGE OF PLANS |
2015/06/04 |
NOTICE OF INTENT |
CHANGE OF PLANS |
2014/11/03 |
SUBSEQUENT REPORT |
MIT |
2009/09/03 |
SUBSEQUENT REPORT |
WELL INTEGRITY |
2009/07/15 |
SUBSEQUENT REPORT |
OTHER |
2009/05/04 |
SUBSEQUENT REPORT |
OTHER |
2005/05/05 |
SUBSEQUENT REPORT |
SHUT-IN-SIGNED |
2004/03/26 |
SUBSEQUENT REPORT-SIGNED |
TEMPORARILY ABANDONED |
2002/05/06 |
APPLICATION |
CHAPTER 3, SECTION 25 |